Mega Shippers
S03E09
S03E0945 min· aired 10/6/2020
New Haven Bridge - Sawn Timber - Flying Fish
TMDb0.0
Overview
Mark has to offload 2,800 tonnes of timber before the weather turns, while Chris transports a 57-metre-long bridge section.
Mark has to offload 2,800 tonnes of timber before the weather turns, while Chris transports a 57-metre-long bridge section.