This Old House
S13E08
S13E08· aired 10/24/1991

The Wayland House - 8

TMDb0.0
Nexus es670885TMDb ep 180054TVDb ep 243396

Overview

Our master carpenter completes the radius frame for the front portico deck, while our general contractor reviews the new engineered wood framing for the kitchen and master bath. Excavator Herb Brockert begins digging the leaching field for the new septic system. Asbestos is removed from pipes in the basement.